Innovative solutions since 1955

ZRE Katowice S.A. assembly, overhauls, diagnostics and maintenance of energy appliences.

Turbines erection in Grain PS

Investor: E-on UK Plc

Location: Isle of Grain, Great Britain

Execution time: january 2009 – march 2010

 

Description:

ZRE Katowice SA within the contracted period completed assembling three gas&steam turbines with total capacity of 1275 MW Grain (England) and currently participates in the acceptance and start-up in accordance with the contract.

The scope of the Contract includes:

  • installation of three gas-steam units complete KA26, rated at 425 MW each,
  • installation of cooling pipes, oil and internal air ducts for all three turbines,
  • installation of acoustical screens for a gas turbine, steam turbine and generator.

This work was carried out in accordance with drawings, procedures and quality standards of Alstom and E. ON UK. According to the Customer company ZRE demonstrated that it is strong and flexible enough to meet contractual and collateral requirements.

generate pdf | print | Recommend to a friend