Erection of a boiler in CHP Bielsko Biała
Investor: Tauron Wytwarzanie
Client: Foster Wheeler
Location: Bielsko Biala, Poland
Completion date: May 2011 – September 2012
Description:
The scope of work carried out by ZRE Katowice S.A. includes the erection of Foster Wheeler CFB boiler with the following parameters:
- Capacity: 220 t / h
- CHP unit power: 50 MWe and 106 MWt
The scope covers the mechanical erection of the pressure part, boiler components, boiler equipment, appliances and boiler conveyors, bottom ash tanks including the support structure, connecting internal pipelines and auxiliary BOP. Total weight of assembled components will be 1800 tons.