ZRE Katowice S.A. assembly, overhauls, diagnostics and maintenance of energy appliences.

Our references

Found elements: 96

Pro Novum Sp. z o.o.
Modernization and overhaul works on the 13UP55 rotor and diaphragms.
2011
Elektrociepłownia "ELCHO" Chorzów Sp. z o.o.
Running repairs, overhauls and modernization of:
  • Foster Wheeler CFB boiler
  • fumes fans
  • steam and water fitting
  • FAMAK stacker-reclaimer
2010
PKE S.A. Elektrownia Jaworzno III
Overhaul of the boilers pressure part; Overhaul of auxiliaries; Medium overhaul of boiler no 4.
2010
Elektrociepłownia "ELCHO" Chorzów Sp. z o.o.
Overhaul and modernization of a CFB 420 t/h boiler, fans, engines, pumps, fittings and a stacker-reclaimer
2010
Elektrownia „Rybnik” S.A.
Medium overhaul of OP-650K K-6 boiler
2009 - 2010
CEZ a.s, Elektrany Prunerov
A TK200 turbine HP,MP and LP rotors overhaul.
2009 - 2010
E-on UK plc
Assembly of three gas & steam KA26 turbines 435 MW each, including pipelines for cooling, air and oil.
2009 - 2010
Liebherr-Werk Nenzing GmBH
Production of load carrying structures of crawling and port cranes.
2007 - 2010
TEREX-DEMAG GmBH
Production of load carrying structures for the crawler cranes
2005 - 2010
PKE S.A. Elektrownia Jaworzno III
General overhaul of the boiler no 3, including:
  • Overhaul of the pressure part
  • Dignostic and overhaul of suspensions of the steam and water pipelines
  • Overhaul and replacement of the casing
  • Overhaul and replacement of the thermal insulation
  • The boilers technical condition assessment and chemical cleaning
  • Scaffold assembly
  • Overhaul of auxiliaries
Medium overhaul of the boiler no 4
2010
PKE S.A. Elektrownia Siersza
General overhaul of the OFz-425 boiler no 2, including:
  • Overhaul of the pressure part
  • Overhaul of the boilers fitting
  • Scaffolding assembly
  • Thermal insulation works
2010
Elektrociepłownia Zabrze SA
General overhaul of a 9C50.32 turbine on block no 7
2010
PKE S.A. Elektrownia Jaworzno III
Overhaul works on depressurization and cooling station 5RS2 - blocks no 5 and 3.
2010
Alstom Power Sp. z o.o.
I&C system assembly on new 858 MW block in PS Bełchatów
2010
Foster Wheeler Energia Polska Sp. z o.o.
Overhaul of a CFB 100 boiler in CHP Katowice. Disassembly and assembly of complete superheaters INTREX.
2010
Elektrociepłownia "Będzin" S.A.
Modernization of the coal feeding I&C system.
2009
Elektrownia „Rybnik” S.A.
Medium overhaul of boilers K-5 and K-1.
2009
PKE S.A. Elektrownia Jaworzno III
General overhaul of boiler on block no 5 and medium overhaul of boiler on block no 2.
2009
TurboCare Sp. z o.o.
Rotor geometry measurements, low speed balancing, and implementing the third bearing technology.
2009
PKE S.A. Elektrownia Łaziska
Medium overhaul of a TK120 - block nr 1 in Łaziska Powerstation
2009
Spółka Energetyczna "Jastrzębie" S.A.
Emergency overhaul of a CHP 125 pump in CHP Zofiówka
2009
PKE S.A. Elektrownia Siersza
General overhaul of the turboset no 1 in Siersza Powerstation
2009
PKE S.A. Elektrownia Łaziska
Overhaul of LP-1 and LP-2 casings
2009
PKE S.A. Elektrownia Łaziska
Reblading and testing of 3L, 3P, 4L, 4P LP rotor levels - turbine type TK230
2009
PKE S.A. Elektrownia Łaziska
Medium overhaul of a 13K225 turbine - block 12 in PS Łaziska.
2009
PKE S.A. Elektrownia Łaziska
General overhaul of a TK230 turbine in Łaziska Powerstation
2009
Elektrociepłownia Tychy S.A.
General overhaul of a KT 40-9,7 turbine.
2009
PKE S.A. Elektrownia Łaziska
General overhaul of steam and water fittings.
2009
Energotechnika-Energorozruch S.A.
Modernization of boilers coal dust burner system
2009
Energotechnika-Energorozruch S.A.
Overhaul and modernization of the burner system on boiler no 6 in "Rybnik" PS.
2009
Energotechnika-Energorozruch S.A.
Assembly of biomass feeding system for OP650 boilers no 1,2,3 in "Rybnik" Powerstation
2009
PKE S.A. Elektrownia Siersza
General overhaul of the turboset no 1.
2009
Metso Power Oy
Complete mechanical assembly of the fluidized bed boiler with biomass-fired CFB power of 55 MW / h.
2008 - 2009
Foster Wheeler Energia Polska Sp. z o.o.
Assembly and commissioning of I&C system on a 460 MW supercritical block.
2008 - 2009
PGE Górnictwo i Energetyka Konwencjonalna S.A. Oddział Kielce
Assembly of a new turboset in CHP Kielce.
2008 - 2009
Elektrownia „Rybnik” S.A.
Overhaul and modernization of OP650K boilers, fittings and burner instalation.
2008 - 2009
Foster Wheeler Energia Polska Sp. z o.o.
Mechanical assembly of the boiler part of the supercritical 460 MW block in PS Łagisza
2007 - 2009
PKE S.A. Elektrociepłownia Katowice
Lifting equipment overhaul
2007 - 2009
Bombardier Transportation Polska Sp. z o.o.
Locomotive body transport
2001 - 2009
PKE S.A. Elektrownia Łaziska
Delivery and assembly of front and back wall tanks of the I stage OP-380k boilers overheaters.
2009
Pro Novum Sp. z o.o.
Modernization and overhaul works of the TG-2 turbines HP-MP and LP rotors and the inner casing.
2009
Siemens Sp. z o.o.
Modenization of technology sequence for gas and thermal treatment of steel on Stalprodukt facillities.
2009
PKE SA Elektrownia Łagisza
Feed water turbo and electropump assembly on a 460 MW block.
2009
Zakłady Remontowe Energetyki Kraków Sp. z o.o.
Disassembly and assembly of the SH2 superheater in Siersza power station.
2009
Elektrownia „Rybnik” S.A.
Overhaul of technology systems on block no 3.
2008
Elektrownia „Rybnik” S.A.
General overhaul of K-2 and K-3 boilers
2008
Elektrownia „Rybnik” S.A.
Revitalization of a HP turbine casing - turbine type 13K225 225 MW
2008
PKE SA Elektrownia Łagisza
General overhaul of a TK-120 turbogenerator - block no 5
2008
PKE S.A. Elektrownia Jaworzno III
Assembly and overhaul works of 13K225 MW turbosets.
2008
PGE Górnictwo i Energetyka Konwencjonalna S.A. Oddzial Lublin-Wrotków
Emergency overhaul of the shut-off valve.
2008
Elektrownia „Rybnik” S.A.
General overhaul of a 13K225 turbine and of the generator mechanical part.
2008
PKE S.A. Elektrownia Łaziska
General overhaul of steam and water fittings - block no 10
2008
Energotechnika-Energorozruch S.A.
Assembly of biomass feeding installation for a OP650 boiler no 4 in "Rybnik" Powerstation.
2008
Elektrociepłownia Zabrze SA
General overahaul of a Skoda boiler
2008
Elektrownia „Rybnik” S.A.
Ovarhaul works on the OP650 boilers no 2,3,4 in "Rybnik" Powerstation
2008
FAMAK S.A.
Assembly of a drum waggon tippler WWB - 90.15 in CHP Bydgoszcz S.A.
2008
ThyssenKrupp
Transport of large size cargoes
2008
PKE SA Elektrownia Łagisza
Optimization of the thermal system
2007 - 2008
PKE S.A. Elektrownia Łaziska
Overhaul of boilers' no 11 fittings.
2007 - 2008
PKE S.A. Elektrownia Łaziska
General overhaul of a OP-650 boiler
2007 - 2008
Elektrociepłownia "Będzin" S.A.
Assembly of a new ŁZKS 100.16 stacker-reclaimer with roadbed modernization.
2007 - 2008
PKE S.A. Elektrownia Łaziska
Assembly and overhaul works.
2007 - 2008
Metso Power Oy
Assembly of boiler including internal pipelines and commisioning in UPM Caledonian Paper Mill, Irwine, UK
2006 - 2008
Elektrociepłownia "Będzin" S.A.
Modernization of the coal feeding system. Including: assembly, start-up, carrying out a trial run, commissioning.
2006 - 2008
PKE S.A. Elektrownia Jaworzno III
Disassembly and assembly of generator stators on block 1- 6 in Jaworzno Powerstation
2003 - 2008
PKE S.A. Elektrownia Łaziska
Block 10 - boiler overhaul including boiler drum repairs.
2008
PKE S.A. Elektrownia Łaziska
General overhaul of a TK-225.
2008
PKE S.A. Elektrownia Łaziska
General overhaul of a TW200 generator.
2008
PKE S.A. Elektrownia Łaziska
Medium overhaul of OP-380 boilers no 1 nad 2 and a general overhaul of a OP-650 boiler no 10.
2008
PKE S.A. Elektrownia Jaworzno III
Medium overaul of the K-3 and K-1 boilers type OP650 and a general overhaul of a K-6 boiler type OP-650.
2008
Elektrociepłownia Tychy S.A.
Overhaul and maintenance service of the boiler K-4 and K-5.
2008
Pro Novum Sp. z o.o.
Overhaul of pipelinas on blocks 5 - 8 200 MW each in PS Rybnik
2007
PKE S.A. Elektrownia Łaziska
General overhaul of steam and water fittings - block no 11.
2007
Elektropriveda Trbovlije
Overhaul of the turbogenetator.
2007
Metso Power Oy
Assembly of a boiler in Steven's Croft Power Plant in Lockerbie
2006 - 2007
Termoelektrana Trbovlje d. o. o.
TK120 turboset general overhaul.
2007
Termoelektrana Trbovlje d. o. o.
Diaphragm discs revitalization
2007
PKE SA Elektrownia Łagisza
Overhaul of MP rotor diaphragms
2007
Elektrownia „Rybnik” S.A.
Overhaul of HP and MP rotor diphragms carried out in cooperation with Pronovum Sp. z o.o.
2007
VHP S.A. EC Siekierki
Overhaul of HP rotor diaphragm carried out in cooperation with Pronovum Sp. z o.o.
2007
ZEC Dalkia Poznań S.A.
Overhaul of HP and MP rotor diaphragms, glands and clamping rings.
2007
PKE S.A. Elektrownia Jaworzno III
Overhaul of a HP rotor diaphragm.
2007
PKE SA Elektrownia Łagisza
General overhaul of two OP-380 boilers.
2007
ZEC Bytom S.A.
Modernization of exhaust ducts in Miechowice powerstation.
2007
Elektrownia „Rybnik” S.A.
Medium overhaul of OP-650 boilers K-5, K-6, K-7 and general overhaul of K-8 boiler.
2007
Metso Power Oy
Boiler assembly including pipelines, environmental systems, and commissioning in Kymmene Ltd, Shotton Paper Company.
2005 - 2006
VHP S.A. EC Siekierki
Overhaul of HP rotor diaphragms.
2006
Zakład Syntezy Amoniaku Anwil S.A.
Revitalization of a 5 MW M25C turbine casing.
2006
Zakład Syntezy Amoniaku Anwil S.A.
Revitalization of a 14 MW turbine casing.
2006
PGE Elektrownia Opole S.A.
Overhaul of the pressure installation of BP-1150 boilers no 1, 2, 3, 4.
2006
Foster Wheeler Power
Assembly of a CFB Foster Wheeler boiler in Shannonbridge powerstation.
2003 - 2005
Termoelektrana Trbovlje d. o. o.
Overhaul of a TK120 turboset in Trbovlje in Slovenia
2005
GE Energy Services Programma Electric Sp. z o.o.
Assembly of a 125 MW GE turbine in PS Zielona Góra
2004
Elektrociepłownia Kostoac B
General overhaul of a 18k348 turbine including the generator, superheater assembly and boiler modernization.
2003
PGE Górnictwo i Energetyka Konwencjonalna S.A. Oddzial Lublin-Wrotków
Assembly of a generator on a 235 MW gas & steam block .
2001
PKE SA Elektrownia Łagisza
Modernization of a TK 120 turbine, and repair works on HP, MP and LP.
1989 - 1999