ZRE Katowice S.A. assembly, overhauls, diagnostics and maintenance of energy appliences.
Our references
Found elements: 96
| Pro Novum Sp. z o.o. | Modernization and overhaul works on the 13UP55 rotor and diaphragms. |
2011 |
| Elektrociepłownia "ELCHO" Chorzów Sp. z o.o. | Running repairs, overhauls and modernization of:
|
2010 |
| PKE S.A. Elektrownia Jaworzno III | Overhaul of the boilers pressure part; Overhaul of auxiliaries; Medium overhaul of boiler no 4. |
2010 |
| Elektrociepłownia "ELCHO" Chorzów Sp. z o.o. | Overhaul and modernization of a CFB 420 t/h boiler, fans, engines, pumps, fittings and a stacker-reclaimer |
2010 |
| Elektrownia „Rybnik” S.A. | Medium overhaul of OP-650K K-6 boiler |
2009 - 2010 |
| CEZ a.s, Elektrany Prunerov | A TK200 turbine HP,MP and LP rotors overhaul. |
2009 - 2010 |
| E-on UK plc | Assembly of three gas & steam KA26 turbines 435 MW each, including pipelines for cooling, air and oil.
|
2009 - 2010 |
| Liebherr-Werk Nenzing GmBH | Production of load carrying structures of crawling and port cranes. |
2007 - 2010 |
| TEREX-DEMAG GmBH | Production of load carrying structures for the crawler cranes |
2005 - 2010 |
| PKE S.A. Elektrownia Jaworzno III | General overhaul of the boiler no 3, including:
|
2010 |
| PKE S.A. Elektrownia Siersza | General overhaul of the OFz-425 boiler no 2, including:
|
2010 |
| Elektrociepłownia Zabrze SA | General overhaul of a 9C50.32 turbine on block no 7 |
2010 |
| PKE S.A. Elektrownia Jaworzno III | Overhaul works on depressurization and cooling station 5RS2 - blocks no 5 and 3. |
2010 |
| Alstom Power Sp. z o.o. | I&C system assembly on new 858 MW block in PS Bełchatów |
2010 |
| Foster Wheeler Energia Polska Sp. z o.o. | Overhaul of a CFB 100 boiler in CHP Katowice. Disassembly and assembly of complete superheaters INTREX. |
2010 |
| Elektrociepłownia "Będzin" S.A. | Modernization of the coal feeding I&C system. |
2009 |
| Elektrownia „Rybnik” S.A. | Medium overhaul of boilers K-5 and K-1. |
2009 |
| PKE S.A. Elektrownia Jaworzno III | General overhaul of boiler on block no 5 and medium overhaul of boiler on block no 2. |
2009 |
| TurboCare Sp. z o.o. | Rotor geometry measurements, low speed balancing, and implementing the third bearing technology. |
2009 |
| PKE S.A. Elektrownia Łaziska | Medium overhaul of a TK120 - block nr 1 in Łaziska Powerstation |
2009 |
| Spółka Energetyczna "Jastrzębie" S.A. | Emergency overhaul of a CHP 125 pump in CHP Zofiówka |
2009 |
| PKE S.A. Elektrownia Siersza | General overhaul of the turboset no 1 in Siersza Powerstation |
2009 |
| PKE S.A. Elektrownia Łaziska | Overhaul of LP-1 and LP-2 casings |
2009 |
| PKE S.A. Elektrownia Łaziska | Reblading and testing of 3L, 3P, 4L, 4P LP rotor levels - turbine type TK230 |
2009 |
| PKE S.A. Elektrownia Łaziska | Medium overhaul of a 13K225 turbine - block 12 in PS Łaziska. |
2009 |
| PKE S.A. Elektrownia Łaziska | General overhaul of a TK230 turbine in Łaziska Powerstation |
2009 |
| Elektrociepłownia Tychy S.A. | General overhaul of a KT 40-9,7 turbine. |
2009 |
| PKE S.A. Elektrownia Łaziska | General overhaul of steam and water fittings. |
2009 |
| Energotechnika-Energorozruch S.A. | Modernization of boilers coal dust burner system |
2009 |
| Energotechnika-Energorozruch S.A. | Overhaul and modernization of the burner system on boiler no 6 in "Rybnik" PS. |
2009 |
| Energotechnika-Energorozruch S.A. | Assembly of biomass feeding system for OP650 boilers no 1,2,3 in "Rybnik" Powerstation |
2009 |
| PKE S.A. Elektrownia Siersza | General overhaul of the turboset no 1. |
2009 |
| Metso Power Oy | Complete mechanical assembly of the fluidized bed boiler with biomass-fired CFB power of 55 MW / h. |
2008 - 2009 |
| Foster Wheeler Energia Polska Sp. z o.o. | Assembly and commissioning of I&C system on a 460 MW supercritical block. |
2008 - 2009 |
| PGE Górnictwo i Energetyka Konwencjonalna S.A. Oddział Kielce | Assembly of a new turboset in CHP Kielce. |
2008 - 2009 |
| Elektrownia „Rybnik” S.A. | Overhaul and modernization of OP650K boilers, fittings and burner instalation.
|
2008 - 2009 |
| Foster Wheeler Energia Polska Sp. z o.o. | Mechanical assembly of the boiler part of the supercritical 460 MW block in PS Łagisza |
2007 - 2009 |
| PKE S.A. Elektrociepłownia Katowice | Lifting equipment overhaul |
2007 - 2009 |
| Bombardier Transportation Polska Sp. z o.o. | Locomotive body transport |
2001 - 2009 |
| PKE S.A. Elektrownia Łaziska | Delivery and assembly of front and back wall tanks of the I stage OP-380k boilers overheaters. |
2009 |
| Pro Novum Sp. z o.o. | Modernization and overhaul works of the TG-2 turbines HP-MP and LP rotors and the inner casing. |
2009 |
| Siemens Sp. z o.o. | Modenization of technology sequence for gas and thermal treatment of steel on Stalprodukt facillities. |
2009 |
| PKE SA Elektrownia Łagisza | Feed water turbo and electropump assembly on a 460 MW block. |
2009 |
| Zakłady Remontowe Energetyki Kraków Sp. z o.o. | Disassembly and assembly of the SH2 superheater in Siersza power station. |
2009 |
| Elektrownia „Rybnik” S.A. | Overhaul of technology systems on block no 3. |
2008 |
| Elektrownia „Rybnik” S.A. | General overhaul of K-2 and K-3 boilers |
2008 |
| Elektrownia „Rybnik” S.A. | Revitalization of a HP turbine casing - turbine type 13K225 225 MW |
2008 |
| PKE SA Elektrownia Łagisza | General overhaul of a TK-120 turbogenerator - block no 5 |
2008 |
| PKE S.A. Elektrownia Jaworzno III | Assembly and overhaul works of 13K225 MW turbosets. |
2008 |
| PGE Górnictwo i Energetyka Konwencjonalna S.A. Oddzial Lublin-Wrotków | Emergency overhaul of the shut-off valve. |
2008 |
| Elektrownia „Rybnik” S.A. | General overhaul of a 13K225 turbine and of the generator mechanical part. |
2008 |
| PKE S.A. Elektrownia Łaziska | General overhaul of steam and water fittings - block no 10 |
2008 |
| Energotechnika-Energorozruch S.A. | Assembly of biomass feeding installation for a OP650 boiler no 4 in "Rybnik" Powerstation. |
2008 |
| Elektrociepłownia Zabrze SA | General overahaul of a Skoda boiler |
2008 |
| Elektrownia „Rybnik” S.A. | Ovarhaul works on the OP650 boilers no 2,3,4 in "Rybnik" Powerstation |
2008 |
| FAMAK S.A. | Assembly of a drum waggon tippler WWB - 90.15 in CHP Bydgoszcz S.A. |
2008 |
| ThyssenKrupp | Transport of large size cargoes |
2008 |
| PKE SA Elektrownia Łagisza | Optimization of the thermal system |
2007 - 2008 |
| PKE S.A. Elektrownia Łaziska | Overhaul of boilers' no 11 fittings. |
2007 - 2008 |
| PKE S.A. Elektrownia Łaziska | General overhaul of a OP-650 boiler |
2007 - 2008 |
| Elektrociepłownia "Będzin" S.A. | Assembly of a new ŁZKS 100.16 stacker-reclaimer with roadbed modernization. |
2007 - 2008 |
| PKE S.A. Elektrownia Łaziska | Assembly and overhaul works. |
2007 - 2008 |
| Metso Power Oy | Assembly of boiler including internal pipelines and commisioning in UPM Caledonian Paper Mill, Irwine, UK |
2006 - 2008 |
| Elektrociepłownia "Będzin" S.A. | Modernization of the coal feeding system. Including: assembly, start-up, carrying out a trial run, commissioning. |
2006 - 2008 |
| PKE S.A. Elektrownia Jaworzno III | Disassembly and assembly of generator stators on block 1- 6 in Jaworzno Powerstation |
2003 - 2008 |
| PKE S.A. Elektrownia Łaziska | Block 10 - boiler overhaul including boiler drum repairs. |
2008 |
| PKE S.A. Elektrownia Łaziska | General overhaul of a TK-225. |
2008 |
| PKE S.A. Elektrownia Łaziska | General overhaul of a TW200 generator. |
2008 |
| PKE S.A. Elektrownia Łaziska | Medium overhaul of OP-380 boilers no 1 nad 2 and a general overhaul of a OP-650 boiler no 10. |
2008 |
| PKE S.A. Elektrownia Jaworzno III | Medium overaul of the K-3 and K-1 boilers type OP650 and a general overhaul of a K-6 boiler type OP-650. |
2008 |
| Elektrociepłownia Tychy S.A. | Overhaul and maintenance service of the boiler K-4 and K-5. |
2008 |
| Pro Novum Sp. z o.o. | Overhaul of pipelinas on blocks 5 - 8 200 MW each in PS Rybnik |
2007 |
| PKE S.A. Elektrownia Łaziska | General overhaul of steam and water fittings - block no 11. |
2007 |
| Elektropriveda Trbovlije | Overhaul of the turbogenetator. |
2007 |
| Metso Power Oy | Assembly of a boiler in Steven's Croft Power Plant in Lockerbie |
2006 - 2007 |
| Termoelektrana Trbovlje d. o. o. | TK120 turboset general overhaul. |
2007 |
| Termoelektrana Trbovlje d. o. o. | Diaphragm discs revitalization |
2007 |
| PKE SA Elektrownia Łagisza | Overhaul of MP rotor diaphragms |
2007 |
| Elektrownia „Rybnik” S.A. | Overhaul of HP and MP rotor diphragms carried out in cooperation with Pronovum Sp. z o.o. |
2007 |
| VHP S.A. EC Siekierki | Overhaul of HP rotor diaphragm carried out in cooperation with Pronovum Sp. z o.o. |
2007 |
| ZEC Dalkia Poznań S.A. | Overhaul of HP and MP rotor diaphragms, glands and clamping rings. |
2007 |
| PKE S.A. Elektrownia Jaworzno III | Overhaul of a HP rotor diaphragm. |
2007 |
| PKE SA Elektrownia Łagisza | General overhaul of two OP-380 boilers. |
2007 |
| ZEC Bytom S.A. | Modernization of exhaust ducts in Miechowice powerstation. |
2007 |
| Elektrownia „Rybnik” S.A. | Medium overhaul of OP-650 boilers K-5, K-6, K-7 and general overhaul of K-8 boiler.
|
2007 |
| Metso Power Oy | Boiler assembly including pipelines, environmental systems, and commissioning in Kymmene Ltd, Shotton Paper Company. |
2005 - 2006 |
| VHP S.A. EC Siekierki | Overhaul of HP rotor diaphragms. |
2006 |
| Zakład Syntezy Amoniaku Anwil S.A. | Revitalization of a 5 MW M25C turbine casing. |
2006 |
| Zakład Syntezy Amoniaku Anwil S.A. | Revitalization of a 14 MW turbine casing. |
2006 |
| PGE Elektrownia Opole S.A. | Overhaul of the pressure installation of BP-1150 boilers no 1, 2, 3, 4. |
2006 |
| Foster Wheeler Power | Assembly of a CFB Foster Wheeler boiler in Shannonbridge powerstation. |
2003 - 2005 |
| Termoelektrana Trbovlje d. o. o. | Overhaul of a TK120 turboset in Trbovlje in Slovenia |
2005 |
| GE Energy Services Programma Electric Sp. z o.o. | Assembly of a 125 MW GE turbine in PS Zielona Góra |
2004 |
| Elektrociepłownia Kostoac B | General overhaul of a 18k348 turbine including the generator, superheater assembly and boiler modernization. |
2003 |
| PGE Górnictwo i Energetyka Konwencjonalna S.A. Oddzial Lublin-Wrotków | Assembly of a generator on a 235 MW gas & steam block . |
2001 |
| PKE SA Elektrownia Łagisza | Modernization of a TK 120 turbine, and repair works on HP, MP and LP. |
1989 - 1999 |