POWER PLANT OSTROŁĘKA

Location: Ostrołęka

Deadline: 2015

On 5th September 2014 ZRE Katowice and Alstom, acting as a consortium, signed a contract for upgrade the TK200 turbine installed

at ZE Ostrołęka B.

The project is aimed at refurbishment of the power unit No. 2.

The scope of jobs includes:

  • Upgrade of the low pressure (LP) part.
  • Revamping of the generator rotor.
  • Replacement of a transformer with its power of 200 MW.

The field jobs are scheduled to be carried out in 2015.