Overhaul of the pressure system of boilers no. 1 and no. 2
TAURON Wytwarzanie S.A. - 2022
Overhaul of steam turbine 13UCK80 type
Elektrociepłownia Będzin Sp. z o.o. - 2021
Erection and disasembly of scaffoldings, thermal insulation and brickworks on unit no. 6
TAURON Wytwarzanie S.A. - 2021
Replacement and modernization of rear wall of combustion chamber of the boiler no 3. in TAURON Wytwarzanie S.A. – Elektrownia Jaworzno III w Jaworznie – Elektrownia II
TAURON Wytwarzanie S.A. - 2021
Mechanical erection during Hooton Bio Power Project, Liverpool, United Kingdom
Repair works of RDF and ash removal system in CHP Zabrze
Fortum Silesia S.A. - 2021
Services in E&IC branch for Fortum Zabrze
Fortum Silesia S.A. - 2021
Diagnostic tests of live and superheated steam pipelines of power units working in creep conditions
PGE Górnictwo i Energetyka Konwencjonalna S.A. - 2021
Delivery, prefabrication and assembly of complete piping installations fot WTE turbine and BIO turbine during project “Construction of new power plant in Wilno – Lithuania”
BUDIMEX S.A. - 2020
Erecion of system scaffoldings in combustion chamber of boiler no. 3 and no. 4
TAURON Wytwarzanie S.A. - 2020
Repair of GAVO at Łaziska Power Plant
TAURON Wytwarzanie S.A. - 2020
Modernization of boilers no. 7, 2, 1 – in 2018, 2019 and 2020
ENEA Wytwarzanie Sp. z o.o. - 2018, 2019, 2020
Modernization of boiler no. 5
ENEA Wytwarzanie Sp. z o.o. - 2020
Construction of Tworog node, located on DN1000 gas pipeline in mechanical, technological, installation and construction branch with earthworks, roads and land development and commissioning
IDS-BUD S.A. - 2020
Modernization of turboset Tz-8 at CHP Siekierki in Warsaw
PGNIG Termika S.A. - 2020
Major overhaul of turboset no. 2 at PGE Energia Ciepła S.A. Oddział nr 1 w Krakowie
PGE Energia Ciepła S.A. - 2020
Mean repair of turbines in 2020, 2021 and 2022
CEZ Chorzów S.A. - 2020, 2021, 2022
Repair in the scope of UDT activities and fittings at CEZ Chorzów S.A. in 2020, 2021 and 2022
Overhaul works in the mechanical industry, carried out during the renovation stopover “SPRING 2018” repair standstill on installations of Grupa LOTOS S. A. in Gdańsk.
Overhaul works in the mechanical industry, carried out during the renovation stopover “SPRING 2017” repair standstill on installations of Grupa LOTOS S. A. in Gdańsk.
Welding and assembly works in the course of the task consisting in the extension of the installation for dosing company fuel additives in the Fuel Depot No 5 in Emilianów
Assembly and welding works on modernization of pumping stations and technological pipelines
EURO-SPAW KASPRZYCKA JOLANTA - 2013
Replacement of fresh steam piping connecting boiler with turbine with suspensions and modernization of secondary steam piping fastening on boiler No. 2 (EP 650-137) for GDF Suez Energia Polska S.A. in Połaniec
GDF SUEZ ENERGIA POLSKA - 2013
POLICE OP230 – Responsibilities of the Project Manager, Project Engineer and specialist investor’s supervision
Grupa Azoty Zakłady Chemiczne Police S.A. - 2018
nstallation of measuring equipment for a biomass-fired fluid boiler, so-called “Green Block”
ENEA POŁANIEC S.A. - 2013
Replacement of fresh steam piping connecting boiler with turbine with suspensions and modernization of secondary steam piping fastening on boiler No. 2 (EP 650-137) for GDF Suez Energia Polska S.A. in Połaniec
GDF SUEZ ENERGIA POLSKA - 2014
Prefabrication and delivery of shaped elements of the fresh steam pipeline for blocks no. 3,4,5
GDF SUEZ ENERGIA POLSKA - 2015
Complete overhaul of pipelines and fittings within the engine room of block 1 and block 5
TAURON WYTWARZANIE - 2015
Delivery, prefabrication, assembly of complete piping installations
BUDIMEX S.A. - 2016
Current and emergency repairs of fittings on boilers and turbines of blocks 1 – 6
TAURON WYTWARZANIE - 2016
Prefabrication and delivery of high pressure pipelines (LAB, LBB, LBC, LBA) together with auxiliary systems and supervision over assembly, as part of the construction of a new power unit with 910 MW capacity for supercritical parameters for Tauron Wytwarzanie. Jaworzno III Power Plant – II Power Plant in Jaworzno
RAFAKO - 2017
Modernization of pipelines and fittings on the circulating water system at Ec Siekierki
PGNiG TERMIKA - 2017
Complete overhaul of fittings and pipelines of the TG-1 turbine set at PGE Energia Ciepła SA in Kraków
PGE ENERGIA CIEPŁA - 2018
Replacing the stator generator of unit A3 with the use of specialized construction without the use of a crane, by means of hydraulic systems for horizontal and vertical transport
Termoelektrana Nikola Tesla - 2014
Modernization and overhaul of the TK225 turbine set block No. 10
TAURON WYTWARZANIE - 2013
Revitalization of the WP valve
TERMOELEKTRANE NIKOLA TESLA - 2017
Repair of the air preheater (bottom section) and replacement of the water heater (1st stage) in the OP-210M – K-10 boiler
CEZ POLSKA - 2018
F1101 at Lyondell Basell – Berre I’Etang, France
CMI SA - 2018
Mechanical installation of a biomass boiler in Kent, Great Britain
BURMEISTER & WAIN SCANDINAVIAN CONTRACTOR - 2018
Improvement of boilers in EC-3 -EC-4 Veolia Łódż.
VEOLIA ENERGIA - 2017
Modernization of the OP-430 boiler no. 10 in the Siekierki Heat and Power Plant
PGNiG Termika - 2017
Replacing the boiler catalyst modules and repairing the economizer of the boiler No. 12
STRABAG AG - 2016
Modernization of the OP-650k boiler unit No. 12
TAURON WYTWARZANIE - 2012
Capital overhaul of the pressure system of the OFz-450B fluidized bed boiler with the replacement of the superheater of the second stage steam (bulkhead) in Elektrociepłownia Żerań
PGNiG TERMIKA - 2014
Renovation works of the K-10 boiler of the 460 MW unit together with auxiliary equipment CFB 1400
TAURON WYTWARZANIE - 2014
assembly of two OSr-57 grate boilers
RAFAKO - 2015
Modernization of the OP-650B steam boiler No. 1 and 2 at the Pątnów 1 Power Plant
SBB ENERG - 2015
Renovation of a K8 type OP-650 boiler
EDF - 2014
Modernization of boiler No. 1 and 2
ENEA WYTWARZANIE SP Z O.O. - 2015
Adaptation of OP-650 K boilers No. 9,10,11,12 to reduce NOx emissions
TAURON WYTWARZANIE - 2015
Modernization with the supply of rotary air heaters on block No. 4,6,3,1 and 5
TAURON WYTWARZANIE - 2015
Revitalization and modernization of the 6 – 215 MW boiler block
Termoelektrana TE Tuzla - 2013
Installation of a 50 MW CFB boiler – Tullis Russell Markinch (Scotland)
VALMET POWER OY - 2013
The CFB 1300 heat source modernization concept
TAURON WYTWARZANIE - 2015
Emergency current repairs of mechanical parts of block devices 1-6
General modernization and overhaul of the 13k225 turbine including auxiliaries on the block no6. Modernization of the gas and vapour suction installation
Workshop overhaul with delivery of parts for 222 MW turboset no. 1 type 13K215
PGE G i EK S.A. Odział Zespół Elektrowni Dolna Odra2015
Water system administrator for hausing of the motor pump
Tauron Wytwarzanie S.A. Elektrownia Łagisza2013
Enhancing of BFB180 boiler no. K3 in EC-4 Łódź
Dalkia Łódź2014
Enhancing of OP-230 boiler no. K2 in EC-4 Łódź
Dalkia Łódź2014
Enhancing of OP-430 boiler no. K7 in EC-4 Łódź
Dalkia Łódź2014
Enancing of turboset Tz1 type13UP55 in EC-4 Łódź
Dalkia Łódż2014
Enhancing of turboset Tz2 type 13CK60 in EC-4 Łódź
Dalkia Łódż2014
Enhancing of turboset Tz1 type 13UC105 in EC-4 Łódź
Dalkia Łódż2014
Leaks removal on the high pressure exchangers PWS of the pipe system , block no 2,overhaul of the diaphgram clamp and the cooler strainer and the exchange of the live steam pipeline elbow
Verification of the calculation model AutoPIPE of steam pipeline in Jaworzno II,TG1
Tauron Elektrociepłownia Bielsko Biała2012
Manufacturing of A8 outcoming steam turbine casing
Man Diesel & Turbo SE 2010
Disassembly and assembly of new INTREX steam superheater
PKE Elektrownia Jaworzno III2011
Manufacturing of grinder 5000
Man Diesel & Turbo SE 2010
Manufacturing of 023 grinder
Man Diesel & Turbo SE 2010
Grinders manufacturing
Man Diesel & Turbo SE 2010
Equipotentialization of the interior space construction of the biomas fuel mixture transport
Fortum Zabrze S.A.2012
Manufacturing of A3 casing
Man Diesel & Turbo SE Niemcy2010
Manufacturing of III casing
Siemens AG Niemcy2010
Manufacturing of welded casing A2 & A2′
Man Diesel & Turbo SE 2010
Manufacturing of A1 outcoming steam turbine casing
Man Diesel & Turbo SE 2010
Manufacturing of A6 outcoming steam turbine casing
Man Diesel & Turbo SE 2010
Mechanical working
Fermstal WKS Sp. z o.o.2010
Mechanical working of grinder chamber
FPM S.A.2010
Manufacturing of damper plate
Man Diesel & Turbo SE 2010
Manufacturing of grinders
Man Diesel & Turbo SE 2010
Manufacturing of a trolley chassis
Jarem Sp.z o.o.2010
General retrofits of K-4 & 8 boilers
EDF Rybnik S.A2012
Manufacturing of grinders
Man Diesel & Turbo SE 2010
Manufacturing of a silos
AET a/s Dania 2010
Manufacturing of a clutch’s sleeve for TK120 HP
Elektrownia Stalowa Wola2010
Pipe bending
Stalbud Tarnów Sp. z o.o2012
Anti-corrosion coating
GRACO Sp.z o.o.2010
Manufacturing of a lifting sling 022
Man Diesel & Turbo SE Niemcy2010
Manufacturing of a stator core’s bed
Turbo Care Poland S.A.2010
Induction pipe bending
Rafako S.A.2011 - 2012
Manufacturing of a 40 MG engine bearer
Man Diesel & Turbo SE 2010
Replacing of steam preheater third-degree OP 140 No. 6 b>
Power Plant Będzin2011
Replacing the steam preheater SH2
Power Plant „Siersza”2010
Replacement of boiler flash tanks of K2 and K3 boilers in EC-4 Łódź
Dalkia Łódź2014
Replacing the evaporator tubes in the area of the hot hopper and replacing parts of the main secondary steam pipe along with support for the safety valve
Power Plant Rybnik S.A.2012
Replacing the evaporator tubes in the area of the hot hopper and replacing parts of the main secondary steam pipe along with support for the safety valve
Power Plant Rybnik S.A.2012
Replacing the pipes connecting the boiler with turbine and suspensions ,modernization of secondary steam pipe fixtures on the boiler No.2 (EP 650-137) for GDF Suez Energy Poland SA in Połaniec b>
Ta strona wykorzystuje funkcjonalne pliki cookie i zewnętrzne skrypty, aby zwiększyć wygodę korzystania i Twoje bezpieczeństwo.
NOTE: These settings will only apply to the browser and device you are currently using.
KLAUZULA INFORMACYJNA DLA KONTRAHENTÓW I PRACOWNIKÓW KONTRAHENTÓW
Zgodnie z art. 13 ust. 1 i 2 oraz art. 14 Rozporządzenia Parlamentu Europejskiego i Rady (UE) 2016/679 z dnia 27 kwietnia 2016 r. w sprawie ochrony osób fizycznych w związku z przetwarzaniem danych osobowych i w sprawie swobodnego przepływu takich danych oraz uchylenia dyrektywy 95/46/WE (dalej RODO), informujemy, że:
Administrator Danych Osobowych
Administratorem przekazanych przez Państwa firmę danych osobowych w ramach zawartej ze ZRE Katowice S.A. umowy lub zamiaru zawarcia umowy, są Zakłady Remontowe Energetyki Katowice S.A., z siedzibą w Katowicach przy ul. Gen. Z. W. Jankego 13. Jeżeli w ramach umowy przekazali nam Państwo dane osobowe swoich pracowników lub współpracowników albo mają zamiar te dane przekazać, informujemy, że niniejsza klauzula ma zastosowanie także do nich i powinna im zostać przez Państwa udostępniona.
Inspektor Ochrony Danych Osobowych
W sprawach dotyczących przetwarzania Państwa danych osobowych mogą Państwo skontaktować się z powołanym przez Administratora Inspektorem Ochrony Danych Osobowych. Kontakt z Inspektorem uzyskają Państwo pisząc na adres: rodo@zre.com.pl
Cel przetwarzania danych osobowych
Zgodnie z art. 6 ust. 1 lit. a), b), c) i f) RODO przekazane przez Państwa dane osobowe będą przetwarzane w celu wykonania obowiązków wynikających z powszechnie obowiązujących przepisów prawa, dla celów prawnie uzasadnionych interesów realizowanych przez ZRE Katowice S.A., w tym w szczególności w celu wykonania umowy lub zamiaru zawarcia umowy, rozpatrywania reklamacji, ustalenia, dochodzenia i obrony wzajemnych roszczeń.
Okres przechowywania danych
Państwa dane osobowe będą przechowywane przez okres obowiązywania umowy lub do czasu wygaśnięcia wzajemnych roszczeń wynikających z umowy ze ZRE Katowice S.A., a następnie przez okres wskazany przez przepisy prawa.
Odbiorcy danych
Państwa dane osobowe w ramach wykonania zawartych umów mogą być przekazywane odbiorcom, takim jak podmioty powiązane ze ZRE Katowice S.A., świadczące usługi na rzecz ZRE Katowice S.A. oraz podmioty współpracujące ze ZRE Katowice S.A.
Zebrane od Państwa dane osobowe w ramach wykonania zawartych umów mogą także być przekazywane podmiotom powiązanym ze ZRE Katowice S.A. działającym poza Unią Europejską. Na etapie doboru i nawiązywania współpracy z kontrahentami spoza UE/ EOG, dbamy aby podmioty te zapewniały odpowiedni poziom ochrony danych osobowych.
Prawa osób, których dane dotyczą
Przysługuje Państwu prawo dostępu do treści Państwa danych, żądania ich sprostowania, usunięcia lub ograniczenia przetwarzania, prawo wniesienia sprzeciwu wobec przetwarzania w zakresie, w jakim podstawą przetwarzania danych osobowych jest prawnie uzasadniony interes Administratora, prawo wycofania udzielonej zgody w zakresie, w jakim jest ona podstawą przetwarzania Państwa danych (przy czym wycofanie zgody nie ma wpływu na zgodność z prawem przetwarzania, którego dokonano na podstawie zgody przed jej wycofaniem), prawo do przenoszenia danych osobowych oraz prawo wniesienia skargi do Prezesa Urzędu Ochrony Danych Osobowych, gdy uznają Państwo, iż przetwarzanie danych osobowych Państwa dotyczących, narusza przepisy RODO.