Foster Wheeler Project in Tychy

Location: Tychy

Deadline: 10.07.2015

On 5th June 2014 the drum of the CFB boiler with the steam capacity of 60.8 kg per second and with steam pressure of 122 bars at 547ºC was finally installed. The jobs were subcontracted by Foster Wheeler Energia Polska Sp. z o.o. on the area of ZW Tychy in the town on Tychy.

The scope of project comprises mechanical erection of the boiler along with related pipelines. The total weight of equipment for erection and installation is 1,690,000 kg and deadline for completion of jobs was agreed upon to 10th July 2015.