Complete overhaul of fittings and pipelines of the TG-1 turbine set at PGE Energia Ciepła SA in Kraków
The scope of work included:
01LAB (inst. Feed water); 01LAF (high-pressure injectors); 01LBA (instanced steam); 01LBB (instance of superheated pair); 01LBF (inst. Station RS-1,2); 01LBG (auxiliary steam piping); 01LBH (inst. Start-up stations); 01LBQ (inst (pair of steam to XW); 01LBS (low-pressure steam piping), 01LBY (pulse), 01MAJ (instillation of vapor), 01LCA (inst. Condensate); 01LCH (inst. Condensate from XW);
01MAG (steam condensation); 01MAL (drainage and de-aeration); 01PAB (inst. And cooling water ducts); 01PAH (for cleaning cooling water); 01PCM (water treatment facility); 01QUA (inst. Collectors).