1. Assembly and disassembly of necessary scaffolding, covering and insulation.
2. Disassembly and assembly of fittings.
3. Regeneration of disassembled fittings.
4. Repair and adjustment of safety valves.
5. Performing weld tests.
6. Completion of the after-failure documentation along with the certificates of the repair. Works performed on the following devices:
• turbine 13 K220 block no. 5,
• turbine 13K225 blocks No. 1,2,3,4 and 6,
• OP-650k boilers 1-6 blocks.
Parameters of fresh steam: P = 13.5 MPa, T = 535 ° C
This website uses cookies so that we can provide you with the best user experience possible. Cookie information is stored in your browser and performs functions such as recognising you when you return to our website and helping our team to understand which sections of the website you find most interesting and useful.