Capital overhaul of the pressure system of the OFz-450B fluidized bed boiler with the replacement of the superheater of the second stage steam (bulkhead) in Elektrociepłownia Żerań

The scope of work included: Preparation of documentation, projects, execution of inventory, preparation, diagnostic works, testing and testing. Replacement of the screen strip of the front and rear wall of the evaporator. Delivery and replacement of the superheater of the second stage bulkhead steam, made of double omega pipes. Anti-erosion protection of screens in the furnace chamber. Preparation and execution of the chemical cleaning and odmiedziowania process of the boiler’s evaporator. Delivery of airtight panel panels to replace the front and back wall evaporator. Renovation of a water heater. Renovation of the evaporator. Repair of the drum with accessories. Renovation of the superheater of the first stage superheater: convection bunch, festoon and hanger pipes, II draft screens, cyclone screens. Renovation of superheaters of the third degree steam.