Complete overhaul of pipelines and fittings within the engine room of block 1 and block 5

1. Repair of fittings and water supply pipelines. 2. Repair of fittings on steam pipelines for the turbine. 3. Renovation of cooling water fittings. 4. Repair of turbine drainage fittings and pipelines. 5. Repair of XW and XN regeneration valves. 6. Repair of fittings and pipelines for condensate, condensate and suction. 7. Repair of fittings and pipelines in the area of ​​the feed water tank. 8. Repair of the vacuum system armature. 9. Preparation for tests and diagnostic tests of pipelines. 10. Execution of the project, delivery of piping and fittings elements, installation of a continuous dewatering pipeline for heating the body of WP and SP. 11. Repair of fresh steam piping suspensions, for secondary overheating, secondary superheated, feed water, minimum flow. 12. Renovation of ROTORK electromechanical drives. 13. Examination of condensate and vapor piping thickness. 14. Replacement of cooling water, condensate and vapor pipelines. 15. Separation and welding of steam piping drains for diagnostic tests. 16. Replacement of steam pipes drainage pipes. 17. Implementation of the project, approval at the UDT together with the execution and replacement of the steam pipe drainage connection from the RS1 station to the secondary overheating. 18. Injection control, drop insert, thermowell cover for SP station cooler, supply and replacement of the steam cooler mixer screens. 19. Installation and disassembly of scaffolding. 20. Disassembly and assembly of thermal insulation.