Under construction project of the ZUOK Municipal Waste Treatment Plant in Bialystok: Delivery, prefabrication, assembly of complete pipeline installations with anti-corrosion protection, including assembly of equipment and accessories supplied by the Employer together with making connections to all devices on pipelines as well as carrying out pressure tests and participation in start-ups cold and hot.
The scope of work included: - Fresh steam pipelines,
- Pipelines feeding water from the degasser to the feedwater pumps,
- Steam pipelines and turbine venting,
- Condensate pipeline,
- Condensate pipelines from heat exchangers and a regenerative exchanger,
- Installation of contaminated drains, drains, desalts and desulphants for expanders,
- Installation of blow pipes,
- Moving water installation,
- Freshwater drainage installation,
- Condensate lines from the air pre-heater,
- Steam pipelines from II turbine venting,
- Steam pipelines from the third turbine vent,
- Discharge pipelines from feedwater pumps to the boiler with injection pipelines,
- Pipelines drainage installation,
- Fuel oil installation.
DN600 18
DN500 10
DN400 55
DN300 124
DN250 59
DN200 520
DN150 330
DN125 190
DNI00 390
DN80 382
DN65 641
DN50 564
DN40 512
DN32 65
DN25 1372
DN15 45
This website uses cookies so that we can provide you with the best user experience possible. Cookie information is stored in your browser and performs functions such as recognising you when you return to our website and helping our team to understand which sections of the website you find most interesting and useful.